Stop Budget Planner
- Utilità
-
Kim Seongyu
I approach investing by asking what drives an investment’s return, what could undermine it, and what evidence would change my view. - Versione: 1.1
- Aggiornato: 24 novembre 2026
Choose a stop and see how much volume fits your cash risk budget. Move the entry, stop and target lines on the price chart. A separate panel shows the lot size, estimated stop loss in the deposit currency, estimated target after costs and reward-to-risk. The planner places no trades.
Start a plan
- Attach the indicator to the instrument you intend to trade. Choose equity, balance or a fixed cash amount as the budget basis.
- Choose Buy or Sell. The initial entry uses the current ask or bid. The initial stop distance is in broker points. Reset levels starts again at the latest quote.
- Select a price line on the chart and drag it. In Inputs, enter the round-trip commission per lot, any minimum round-trip commission and an allowance for adverse stop slippage. The panel shows the modeled commission in your deposit currency.
How sizing works
The result is rounded down to the broker's volume step and capped at its maximum volume. If the minimum lot would exceed the budget, the panel shows its estimated risk and gives no size. For example, a 100-unit cash budget and a 51-unit modeled loss per lot allow 1.96 lots with a 0.01 step. The estimated loss is 99.96 units. These numbers illustrate the calculation.
For a small position, a broker's minimum charge can determine the size. With a 10 USD budget, a 50 USD price loss per lot, a 4 USD round-trip rate per lot and a 3 USD round-trip minimum, 0.14 lots uses the full budget. Price loss is 7 USD and commission is 3 USD. Enter the combined opening and closing minimum for one planned position. For example, identical 1.50 USD minimums on entry and exit give a 3 USD round-trip minimum.
| Input | What it changes |
|---|---|
| Budget basis, risk percent, fixed cash | Select the source and size of the budget in account currency. |
| Round-trip commission per lot and minimum round-trip commission | Both use deposit currency. The planner applies the larger of volume times the rate or the minimum, once per modeled outcome. A zero minimum keeps per-lot sizing. |
| Exit slippage in points | Moves the modeled stop execution farther from entry. |
| Initial stop points, reward/risk and side | Set the three initial chart levels. |
| Show example | Inspect a labeled fictional 10,000 USD account and a contract worth 1 USD per 0.01 price tick per lot. Live chart lines are available in regular mode. |
Platform and execution assumptions
MT5 uses the symbol's reported tick size and separate deposit-currency tick values for losing and profitable price changes. Exchange bonds and collateral instruments are outside its scope. MT4 uses the broker's reported deposit-currency tick value and price tick size. Check the contract information on the instrument, especially for CFDs. A missing or unusable quote produces a status message. The planner estimates price loss and the costs you enter. It does not check free margin, predict a gap or guarantee a fill. Funding charges and other costs you have not entered are outside the estimate.
