Job finished
Execution time 4 days
Feedback from customer
Great service, he know his stuff
Feedback from employee
Good employer ! Thank you :)
Specification
Strategy Specification: Time-Based Breakout with Retracement Entry (Fully Mechanical)
Session Box Definition
- Time Window: Draw a box from 17:00 to 19:59 (UTC-4). from 17:00 new trading day begins and previous days unopened positions should be canceled but the open positions should be kept open until it hits tp or sl.
- Box Parameters:
- High of the box = highest price within the time window
- Low of the box = lowest price within the time window
- The box remains fixed for the rest of the trading day.
Breakout Condition
- A breakout is confirmed only when a 15-minute candle closes with its body fully outside the box: (the only criteria is the body should be closed outside the box, it doesn’t matter how far the body closed or how big the wick is, which means even a minor body close is valid)
- Bullish breakout: candle body closes entirely above the box
- Bearish breakout: candle body closes entirely below the box
- Wicks do not count as breakouts — only full body closures.
Entry Conditions
- Upon detecting a breakout:
- If bullish breakout, place a buy limit order at the top (high) of the box.
- If bearish breakout, place a sell limit order at the bottom (low) of the box.
- Retracement into the box is required to trigger the entry. so a limit order is needed for this strategy
Stop Loss (SL) and Take Profit (TP)
- SL is always placed at the opposite edge of the box:
- Buy trade SL = bottom of the box
- Sell trade SL = top of the box
- TP is always set to 1:3 Risk-to-Reward (fixed ratio), calculated based on the distance between entry and SL.
Risk Management
- The lot size must be calculated dynamically to risk exactly 1% of the account balance per trade, based on SL distance in pips. (this should be easily editable and should need instructions to do so)
- Trade is either a full win (TP hit) or full loss (SL hit). No partial exits.
Trade Rules
- Only one trade per day is allowed.
- If the limit order is not triggered by end of day, cancel it.
- After a TP or SL hit, no further trades are taken for the day.
Parameters to Keep Editable
(These should be made user-configurable in input settings)all these parameters should be editable. I also need a source code of the strategy
- Box start and end time (default: 17:00–19:59 UTC-4) - this part should be editable
- Risk percentage per trade (default: 1%) -this should be editable
- Risk-to-reward ratio (default: 1:3)
- Maximum trades per day (default: 1)
- Time to cancel pending order (e.g., by midnight or user-defined).
Responded
1
Rating
Projects
29
3%
Arbitration
4
25%
/
0%
Overdue
3
10%
Working
2
Rating
Projects
2934
63%
Arbitration
124
44%
/
26%
Overdue
429
15%
Free
3
Rating
Projects
24
8%
Arbitration
9
33%
/
33%
Overdue
1
4%
Loaded
4
Rating
Projects
90
29%
Arbitration
24
13%
/
58%
Overdue
7
8%
Working
5
Rating
Projects
287
64%
Arbitration
3
100%
/
0%
Overdue
65
23%
Working
6
Rating
Projects
718
34%
Arbitration
35
69%
/
9%
Overdue
22
3%
Working
7
Rating
Projects
179
46%
Arbitration
3
33%
/
33%
Overdue
1
1%
Working
8
Rating
Projects
46
59%
Arbitration
2
100%
/
0%
Overdue
1
2%
Working
Published: 5 codes
9
Rating
Projects
4
0%
Arbitration
3
33%
/
33%
Overdue
0
Free
10
Rating
Projects
1
0%
Arbitration
0
Overdue
0
Free
11
Rating
Projects
0
0%
Arbitration
0
Overdue
0
Free
12
Rating
Projects
147
67%
Arbitration
21
10%
/
71%
Overdue
44
30%
Free
13
Rating
Projects
439
54%
Arbitration
22
50%
/
14%
Overdue
30
7%
Loaded
14
Rating
Projects
35
23%
Arbitration
4
0%
/
50%
Overdue
2
6%
Working
15
Rating
Projects
289
35%
Arbitration
18
22%
/
61%
Overdue
43
15%
Free
16
Rating
Projects
24
50%
Arbitration
1
100%
/
0%
Overdue
6
25%
Free
17
Rating
Projects
2
0%
Arbitration
1
0%
/
100%
Overdue
0
Free
Published: 2 codes
18
Rating
Projects
91
25%
Arbitration
26
19%
/
54%
Overdue
25
27%
Free
19
Rating
Projects
499
67%
Arbitration
5
40%
/
0%
Overdue
4
1%
Free
Published: 8 codes
20
Rating
Projects
51
8%
Arbitration
0
Overdue
0
Free
21
Rating
Projects
84
64%
Arbitration
5
100%
/
0%
Overdue
9
11%
Free
22
Rating
Projects
1
0%
Arbitration
1
100%
/
0%
Overdue
0
Free
23
Rating
Projects
513
19%
Arbitration
34
44%
/
32%
Overdue
34
7%
Loaded
Similar orders
Brotus AI
32+ USD
And let's talk about Linux and more about those technologies, ideas, those AI ideas.Let's make an AI technology summit for us base on wgat i wanna build and their example pictures of roadmapBoss can we take those idea all we've talked about base on technology, tech, UI...J.A.R.V.I.S...eDEX-UI into reality (solution) using laptop cause I think it give accces to build app amd more
Developer to build a simple EA
30+ USD
I am looking for an experienced MQL5 developer to code a custom Expert Advisor for MetaTrader 5 based on my own private trading strategy.I have all the specific entry rules, exit conditions, and risk management parameters fully prepared. I will share these exact details with the selected developer via direct message once the job is initiated.The final delivery must include the clean, fully commented source code (.mq5
Advanced Forex Expert Advisor-fully automated system
200 - 300 USD
I require a custom EA and an accompanying custom indicator built in MQL5 for Meta Trader 4/5. The EA must be fully automated (Algo Trading); Telegram-Signal-Linked and named 'AMK Fx'
Professional AI Automation Trading Bot for Forex & Crypto
500 - 1500 USD
Title Professional AI Automation Trading Bot for Forex & Crypto Solution Language Python (preferred) or MQL5 depending on integration requirements. Categories Expert Advisor (EA) for MetaTrader 5 Automated trading strategies AI/ML-based signal generation Risk management automation Required Skills Strong knowledge of MQL5/Python Experience with MetaTrader API integration Machine learning model deployment
Binance Ai Trading Bot $US700 budget negotiable
700 - 3000 USD
I need an Ai trading bot for Binance and BTC on MT5 that also uses order flow data. It should also make use of TSI- Temporal indicator sampling and also it should make use of fundamental analysis in the process of signal generation
ZigZag based on oscillators is needed The idea of the indicator Create a ZigZag indicator, which is constructed based on extreme values determined using oscillators. It can use any classical normalized oscillator, which has overbought and oversold zones. The algorithm should first be executed with the WPR indicator, then similarly add the possibility to draw a zigzag using the following indicators: CCI Chaikin RSI
Project information
Budget
50 - 100 USD