- Equidad
- Reducción
Distribución
| Símbolo | Transacciones | Sell | Buy | |
|---|---|---|---|---|
| XAUUSD.i | 114 | |||
|
25
50
75
100
125
150
175
200
|
25
50
75
100
125
150
175
200
|
25
50
75
100
125
150
175
200
|
| Símbolo | Beneficio Bruto, USD | Loss, USD | Beneficio, USD | |
|---|---|---|---|---|
| XAUUSD.i | -17 | |||
|
200
400
600
800
|
200
400
600
800
|
200
400
600
800
|
| Símbolo | Beneficio Bruto, pips | Loss, pips | Beneficio, pips | |
|---|---|---|---|---|
| XAUUSD.i | 3.8K | |||
|
20K
40K
60K
|
20K
40K
60K
|
20K
40K
60K
|
- Deposit load
- Reducción
El deslizamiento medio a base de la estadística de ejecución en las cuentas reales de diferentes corredores se indica en puntos. Depende de la diferencia de las cotizaciones del proveedor de "EightcapInternational-Real-4" y del suscriptor, así como del retardo en ejecutar las órdenes. Cuanto menos sea este valor, mejor será la calidad del copiado.
No hay datos
The 1-2-3 strategy is a price action and trend reversal technique. The setup involves identifying a point 1 (main maximum/minimum), a point 2 (retracement), and a point 3 (minimum/minimum lower than point 1). Entry occurs at the break of point 2, with stop loss beyond point 3.
How to Identify the Pattern
The formation identifies a reversal of the trend from bullish to bearish (pattern 1-2-3 High) or from bearish to bullish (pattern 1-2-3 Low):Point 1: It is the initial high or low of the downtrend.Point 2: The price reverses direction creating a low (in an uptrend) or a high (in a downtrend).Point 3: The price retraces again, but stops before passing Point 1.
Operating Rules
To operate effectively on currency pairs (such as EUR/USD or GBP/USD), the correct application follows precise levels: Entry (Breakout): Place a buy (Long) order if the price breaks Point 2 upwards (in the 1-2-3 Low pattern), or sell (Short) order if it breaks Point 2 downwards. Stop Loss: It is placed beyond Point 3, so as to exit the trade if the formation is invalidated by the market. Take Profit: The amplitude in pips between Point 2 and Point 3 is measured and this distance is projected from the break level (Point 2).