Specification
Type:Expert advisor for MT4.
Name: Moving average cross over Sell Entry: Bar0 bearish High > MA && Bar0 bearish Low < MA
Sell Filter: Bar1 bullish High > MA && Bar1 bullish Low < MA
Buy Entry: Bar0 bullish High > MA && Bar0 bullish Low < MA
Buy Filter: Bar1 bearish High > MA && Bar1 bearish Low < Ma.
Others: (a) Open sell trade if sell conditions agree
(b)Open buy trade if buy conditions agree
(c)Show pop-up notification.
Take-profit: Include trailing profit as take-profit.
Stop-loss: (a)Exist losing Sell trade if the current price is greater than the high of the Sell Entry
(B) Exist losing Buy trade if the current price is less than the low of the Buy entry
Name: Moving average cross over Sell Entry: Bar0 bearish High > MA && Bar0 bearish Low < MA
Sell Filter: Bar1 bullish High > MA && Bar1 bullish Low < MA
Buy Entry: Bar0 bullish High > MA && Bar0 bullish Low < MA
Buy Filter: Bar1 bearish High > MA && Bar1 bearish Low < Ma.
Others: (a) Open sell trade if sell conditions agree
(b)Open buy trade if buy conditions agree
(c)Show pop-up notification.
Take-profit: Include trailing profit as take-profit.
Stop-loss: (a)Exist losing Sell trade if the current price is greater than the high of the Sell Entry
(B) Exist losing Buy trade if the current price is less than the low of the Buy entry
Responded
1
Rating
Projects
165
24%
Arbitration
23
9%
/
78%
Overdue
16
10%
Working
2
Rating
Projects
67
37%
Arbitration
5
40%
/
40%
Overdue
1
1%
Free
3
Rating
Projects
552
35%
Arbitration
79
32%
/
42%
Overdue
199
36%
Working
4
Rating
Projects
628
33%
Arbitration
38
37%
/
50%
Overdue
11
2%
Loaded
5
Rating
Projects
0
0%
Arbitration
1
0%
/
100%
Overdue
0
Free
Similar orders
Robot Requirements Specification
30 - 100 USD
step by step and structure this into a full IEEE 830 / ISO/IEC/IEEE 29148 style Requirements Specification. This format will include: Introduction System Overview Functional and Performance Requirements Traceability Matrix (linking requirements to test cases) Verification and Validation Compliance Standards 1. Introduction 1.1 Purpose The purpose of this document is to define the technical requirements for the
Project information
Budget
36+ USD