Create a TDI-based EA and add filters. Indicator already with some Buffers.

MQL5 Uzmanlar Dönüştürme

İş tamamlandı

Tamamlanma süresi: 17 gün
Müşteri tarafından geri bildirim
Leonardo is a very patient and proactive professional, who understands and solves everything that is proposed quickly and effectively. I hope we can work together again in the future.
Geliştirici tarafından geri bildirim
Really smart and awesome client. Recommended!!!

Şartname

I need an EA based on imported indicator settings, with addition of some filters and risk management. (BE/SL/TP)

About the setup:

HA Candle breaking the SMMA 5 

TDI PRICE LINE breaking through market and middle band.

NECESSARY:

  • Stops are based on the FRACTAL indicator
  •  The trailing stop is based on MOVING AVERAGES
  • Lot Calculation: % of total balance / RISK %
  • MOVING AVERAGES ARE THE TREND FILTERS, ONLY TRADE ABOVE OR BELOW THEM - 3 distinct moving averages, with the option to toggle this filter on and off.
  • TDI SERVES AS A MOMENTUM INDICATOR, BUY OR SELL IS ONLY POSSIBLE IF THE LINES ARE CROSSED
  •  BUY OR SELL TRIGGER IS THE BREAKDOWN OF THE RESPECTIVE HA CANDLE AT THE SMOOTHED MOVING AVERAGE*
  •  *IMPORTANT:Entry is only allowed if the breakout occurs until the THIRD CANDLE of the same color closes.
  •  MORE INFORMATION ABOUT THE SETUP WITH SELL AND BUY EXAMPLES ARE ATTACHED
  •  DESIRABLE PANEL WITH INFORMATION ON DAILY/WEEKLY/MONTHLY/ACCUMULATED.
  •  IF THE LAST  OPERATION WAS NEGATIVE IN A SPECIFIC PAIR, THE NEXT OPERATION IN THE SAME PAIR MUST TAKE X TIMES THE INITIAL STOP. (OPTIONALLY)
  •  IF THE OPERATION IS POSITIVE, AFTER THE TRAILING STOP, THE MAXIMUM GAIN IS X TIMES THE INITIAL SL . 
  • DESIRABLE POSSIBILITY OF MARTINGALE IN CASE OF SL. 
  • EACH OPERATION IS 2 DISTINCT ENTRIES. ONE WITH TAKE PROFIT AND ANOTHER WITH TRAILING STOP (THEY SHARE THE SAME BREAKVEN) 
  • BREAKEVEN RULE: LAST FRACTAL DISTANCE (%SL) OR THE DISTANCE OF OPPOSITE TRIGGER (OPPOSITE SMMA)
  •  *OPEN SOURCE CODE.


Yanıtlandı

1
Geliştirici 1
Derecelendirme
(43)
Projeler
66
12%
Arabuluculuk
12
58% / 42%
Süresi dolmuş
1
2%
Serbest
2
Geliştirici 2
Derecelendirme
(144)
Projeler
186
41%
Arabuluculuk
24
58% / 21%
Süresi dolmuş
13
7%
Serbest
3
Geliştirici 3
Derecelendirme
(44)
Projeler
53
38%
Arabuluculuk
8
13% / 38%
Süresi dolmuş
8
15%
Serbest
4
Geliştirici 4
Derecelendirme
(25)
Projeler
34
26%
Arabuluculuk
4
50% / 25%
Süresi dolmuş
4
12%
Serbest

Proje bilgisi

Bütçe
30 - 54 USD
Son teslim tarihi
to 2 gün