Trabajo finalizado
Plazo de ejecución 17 días
Comentario del Cliente
Leonardo is a very patient and proactive professional, who understands and solves everything that is proposed quickly and effectively. I hope we can work together again in the future.
Comentario del Ejecutor
Really smart and awesome client. Recommended!!!
Tarea técnica
I need an EA based on imported indicator settings, with addition of some filters and risk management. (BE/SL/TP)
About the setup:
HA Candle breaking the SMMA 5
TDI PRICE LINE breaking through market and middle band.
NECESSARY:
- Stops are based on the FRACTAL indicator
- The trailing stop is based on MOVING AVERAGES
- Lot Calculation: % of total balance / RISK %
- MOVING AVERAGES ARE THE TREND FILTERS, ONLY TRADE ABOVE OR BELOW THEM - 3 distinct moving averages, with the option to toggle this filter on and off.
- TDI SERVES AS A MOMENTUM INDICATOR, BUY OR SELL IS ONLY POSSIBLE IF THE LINES ARE CROSSED
- BUY OR SELL TRIGGER IS THE BREAKDOWN OF THE RESPECTIVE HA CANDLE AT THE SMOOTHED MOVING AVERAGE*
- *IMPORTANT:Entry is only allowed if the breakout occurs until the THIRD CANDLE of the same color closes.
- MORE INFORMATION ABOUT THE SETUP WITH SELL AND BUY EXAMPLES ARE ATTACHED
- DESIRABLE PANEL WITH INFORMATION ON DAILY/WEEKLY/MONTHLY/ACCUMULATED.
- IF THE LAST OPERATION WAS NEGATIVE IN A SPECIFIC PAIR, THE NEXT OPERATION IN THE SAME PAIR MUST TAKE X TIMES THE INITIAL STOP. (OPTIONALLY)
- IF THE OPERATION IS POSITIVE, AFTER THE TRAILING STOP, THE MAXIMUM GAIN IS X TIMES THE INITIAL SL .
- DESIRABLE POSSIBILITY OF MARTINGALE IN CASE OF SL.
- EACH OPERATION IS 2 DISTINCT ENTRIES. ONE WITH TAKE PROFIT AND ANOTHER WITH TRAILING STOP (THEY SHARE THE SAME BREAKVEN)
- BREAKEVEN RULE: LAST FRACTAL DISTANCE (%SL) OR THE DISTANCE OF OPPOSITE TRIGGER (OPPOSITE SMMA)
- *OPEN SOURCE CODE.
Han respondido
1
Evaluación
Proyectos
66
12%
Arbitraje
12
58%
/
42%
Caducado
1
2%
Libre
2
Evaluación
Proyectos
186
41%
Arbitraje
24
58%
/
21%
Caducado
13
7%
Libre
3
Evaluación
Proyectos
53
38%
Arbitraje
8
13%
/
38%
Caducado
8
15%
Libre
4
Evaluación
Proyectos
34
26%
Arbitraje
4
50%
/
25%
Caducado
4
12%
Libre
Información sobre el proyecto
Presupuesto
30 - 54 USD
Plazo límite de ejecución
a 2 día(s)