Specification

Good Day. I have an indicator that I can't get to function how I need to. I have a very specific strategy and rules that the indicator must abide by. Attached is what I have so far. But I can't get the adjustments I need on the indicator correct. Most people would rather start from scratch which is fine too. Just let me know. There is a very specific strategy which goes with this..... Bid to get full requirements

Responded

1
Developer 1
Rating
(43)
Projects
66
12%
Arbitration
12
58% / 42%
Overdue
1
2%
Free
2
Developer 2
Rating
(213)
Projects
246
45%
Arbitration
42
10% / 57%
Overdue
5
2%
Free
3
Developer 3
Rating
(625)
Projects
983
47%
Arbitration
32
38% / 34%
Overdue
96
10%
Working
Published: 6 codes
4
Developer 4
Rating
(77)
Projects
243
74%
Arbitration
7
100% / 0%
Overdue
1
0%
Free
Published: 1 article
5
Developer 5
Rating
(473)
Projects
1139
44%
Arbitration
51
31% / 33%
Overdue
501
44%
Free
6
Developer 6
Rating
(54)
Projects
102
23%
Arbitration
12
25% / 17%
Overdue
13
13%
Free
7
Developer 7
Rating
(132)
Projects
178
39%
Arbitration
4
25% / 50%
Overdue
14
8%
Free
8
Developer 8
Rating
(1)
Projects
1
0%
Arbitration
0
Overdue
1
100%
Free
Similar orders
step by step and structure this into a full IEEE 830 / ISO/IEC/IEEE 29148 style Requirements Specification. This format will include: Introduction System Overview Functional and Performance Requirements Traceability Matrix (linking requirements to test cases) Verification and Validation Compliance Standards 1. Introduction 1.1 Purpose The purpose of this document is to define the technical requirements for the

Project information

Budget
30+ USD
Deadline
to 2 day(s)