Robot bollinger+tma

İş tamamlandı

Tamamlanma süresi: 4 saat
Müşteri tarafından geri bildirim
super super super proferssional
Geliştirici tarafından geri bildirim
good customer.... thanks again.

İş Gereklilikleri

the robot must interact with 2 indicators the first indicator the bollinger the second indicator tma + cgmaden.

buy: close of the candle, blue indicator tma ,outside the bollinger channel.

sell: close of the candle  red indicator tma, out of the bollinger channel.

option robot:

lot size:

take profit : pip, opposite color indicator close candle.

stop loss:

layer_multiplier: 

minimum distance in pips between one opening and the next with multiplier.

first opening only outside the bollinger channel. regole




take profit

Dosyalar:

Yanıtlandı

1
Geliştirici 1
Derecelendirme
(361)
Projeler
643
26%
Arabuluculuk
92
72% / 14%
Süresi dolmuş
12
2%
Çalışıyor
Yayınlandı: 1 kod
2
Geliştirici 2
Derecelendirme
(390)
Projeler
416
30%
Arabuluculuk
74
19% / 70%
Süresi dolmuş
52
13%
Çalışıyor
Benzer siparişler
I am looking for serious developers or providers to purchase professional trading indicators for MetaTrader 5 , with full, open, and editable MQL5 source code . Indicators of interest: Supply & Demand Order Block Breaker Block Liquidity Fair Value Gap (FVG) Automatic / advanced Fibonacci Market Structure Mandatory requirements: 100% MetaTrader 5 compatible Full MQL5 source code included (no locked or compiled-only
Hello, I am looking for an experienced MQL5 developer for a long-term professional collaboration , focused on the development, optimization, and improvement of Expert Advisors and automated trading systems for MetaTrader 5. Requirements: Strong knowledge of MQL5 and EA development for MT5 Solid understanding of trading , not only programming, including experience with: Smart Money Concepts (SMC) ICT methodologies
un indicatore che visualizzi dei pallini sulle strutture esterne, che abbia la possibilita di inserirli su i seguenti timeframe m1,m5,m15,H1,H4,Daily,Weekly,Monthly con la possibilità di attivarli e disattivarli, come regola, in mezzo a 2 minimi ci deve essere un massimo e in mezzo a 2 massimi ci deve essere un minimo, ma solo dopo aver superato la struttura precedente seguendo il trend

Proje bilgisi

Bütçe
40+ USD
Son teslim tarihi
from 1 to 5 gün