I need a robot to find cointegrated pairs which are off 2 standard deviations.

Техническое задание

my idea is to create a robot which finds cointegrated pairs using simple and  multiple regression, I will give the variables.

The project is: A Robot which will scan a list of stocks or forex to find cointegrated pairs according to the augmented dickey-fuller test,

the robot will scan and then ONLY show the pairs which are out of 2 standard deviations.

The Robot also will indicate the ADF score "-4,32";  ADF%: "90%" OR "95%" OR "99%" 

also will indicate the half-life of the operation 

indicates the Beta of the pair and the Deviation of the residual.

Simple Regression: E = Y - (Beta.X) - A

Multiple Regression: E = Y - (Beta.X) - (Timecoef.Time) - a    (which time is the number of periods)  

Multiple Regression: E = Y - (Beta.X) - (Timecoef.Time^2) - a

Multiple Regression: E = Y - (Beta.X) - (Timecoef.Time) - (Timecoef2.Time^2) - a

half-life : based on ORNSTEIN-UHLENBACK

I have an excel sheet which all calculations to help develop the robot.

 



I have the calculations of the regressions and the half-life I can support with that

Here's a example of what I want but this indicator only searches for the best period.



Откликнулись

1
Разработчик 1
Оценка
(83)
Проекты
143
52%
Арбитраж
8
13% / 75%
Просрочено
22
15%
Свободен
2
Разработчик 2
Оценка
(515)
Проекты
554
53%
Арбитраж
13
69% / 15%
Просрочено
3
1%
Свободен
3
Разработчик 3
Оценка
(11)
Проекты
17
59%
Арбитраж
2
0% / 100%
Просрочено
2
12%
Свободен
4
Разработчик 4
Оценка
Проекты
0
0%
Арбитраж
0
Просрочено
0
Свободен
5
Разработчик 5
Оценка
(298)
Проекты
478
40%
Арбитраж
105
40% / 24%
Просрочено
82
17%
Загружен
Опубликовал: 2 примера
6
Разработчик 6
Оценка
(45)
Проекты
91
13%
Арбитраж
34
26% / 59%
Просрочено
37
41%
Свободен

Информация о проекте

Бюджет
30 - 300 USD
Сроки выполнения
от 1 до 20 дн.