Termos de Referência

Scenario

First: Determine the type of sale or Buy on the assumption that I chose to buy,

You set the target as a price or point

You set the Buy Limit price on Instant Access and "OK"

, "BUY" is entered as a LOT 0.01 predefined transaction from the control panel as the figure or picture at 1.1600

1. At the time of entry, the target is set at 1.1650

2. The expert put the appropriate point at the previous loss limit Loss of the previous loss Profit is 1.1650 -1.1600 = 50 points,

According to the previous equation, the purchase limit is 1 =

(1,1600 - 1.1500) - (1,155 - 1.1500) * 0.01 (1000$) + (1.1550 - 1.1500) / (1,155 - 1.1500)

Buy Limit 1 = (Pips 0.0100) - (0.0050) * 0.01 ($ 1000) + (0.0050) / (0.0050)

Buy Limit = 100 - 50 * 0.01 Lot + 50/50

0.0050 * 0.01 + 0.0050 / 0.0050 = 0.0100 / 0.0050 = 0.02 ($ 2000)

If the purchase limit size is = 0.02

Which makes the Expert immediate position and put the target same goal of the first deal 50 points

Which is 1.1550

1.1500 + 50 pips = 1.1550

When the price reverses in the first deal until 1.1500, the buy limit enters and when the price reaches 1.1550, all trades close with the elimination of the second limit.

Arquivos anexados:

PNG
Expert.png
601.3 Kb

Respondido

1
Desenvolvedor 1
Classificação
(365)
Projetos
412
36%
Arbitragem
35
26% / 57%
Expirado
63
15%
Livre
2
Desenvolvedor 2
Classificação
(213)
Projetos
246
45%
Arbitragem
42
10% / 57%
Expirado
5
2%
Livre
3
Desenvolvedor 3
Classificação
(442)
Projetos
570
37%
Arbitragem
106
39% / 33%
Expirado
17
3%
Livre
4
Desenvolvedor 4
Classificação
(349)
Projetos
463
51%
Arbitragem
41
24% / 49%
Expirado
149
32%
Livre
5
Desenvolvedor 5
Classificação
(90)
Projetos
118
17%
Arbitragem
44
23% / 39%
Expirado
20
17%
Livre
6
Desenvolvedor 6
Classificação
(430)
Projetos
606
55%
Arbitragem
48
23% / 56%
Expirado
176
29%
Livre
7
Desenvolvedor 7
Classificação
(258)
Projetos
396
28%
Arbitragem
69
19% / 49%
Expirado
121
31%
Livre
Pedidos semelhantes
step by step and structure this into a full IEEE 830 / ISO/IEC/IEEE 29148 style Requirements Specification. This format will include: Introduction System Overview Functional and Performance Requirements Traceability Matrix (linking requirements to test cases) Verification and Validation Compliance Standards 1. Introduction 1.1 Purpose The purpose of this document is to define the technical requirements for the

Informações sobre o projeto

Orçamento
30 - 101 USD
Prazo
de 1 para 4 dias