Calculation/Backtest which position size with a 10k EUR account and 1:30 Leverage restriction

MQL5 Aconselhamento

Trabalho concluído

Tempo de execução 12 dias

Termos de Referência

Hello, 

I have a strategy for the forex markets. I also have an EA, but it is not a multi-currency EA. 

However, I want to test the following:

My strategy allows for 3 forex pairs to be tradet at the same time. Each pair can have up to 4 positions. I am trading a 10k EUR account. I want to see if the margin is sufficient, if 3 pairs with up to 4 positions each are tradet simultanesouly. So I need to the the development of the margin in a chart and with numbers over time to make sure that a 1:30 Levearge is enough in a worst-case situation. My position size is calculated such that positions have the following risk: 

Position 1 = 0.25% risk over 1 ADR
Position 2 = 0.35% risk over 1 ADR
Position 3 = 0.50% risk over 1 ADR
Position 4 = 0.50% risk over 1 ADR

So for EUR/USD with a current ADR of around 70 Pips, the position sizes would be: 

Position 1 = 0.04 Lot
Position 2 = 0.05 Lot
Position 3 = 0.08 Lot
Position 4 = 0.08 Lot

Depending on the ADR of the respective currency pair, these sizes could vary. 

These are the pairs I am trading. I need to know how the margin looks like if any of these 3 pairs are open with 4 positions echt at the same time on an account with 1:30 leverage:

EURUSD;GBPUSD;AUDUSD;NZDUSD;USDJPY;USDCHF;USDCAD;EURGBP;EURNZD;EURAUD;EURCAD;EURJPY;EURCHF;NZDJPY;NZDCHF;NZDCAD;GBPNZD;GBPJPY;GBPCHF;GBPCAD;GBPAUD;CHFJPY;CADJPY;CADCHF;AUDNZD;AUDJPY;AUDCHF;AUDCAD;


I need someone who deeply understands Margin-Requirements, Forex position sizes, risk backtesting and trading. 
Perhaps this can be tested in Quant Analyzer or some other programm

If you know how to do this, write me with a detailed message. I need this done fast, so within 1 or 2 days MAX. 

Thanks
Dave 

Respondido

1
Desenvolvedor 1
Classificação
(75)
Projetos
111
50%
Arbitragem
26
31% / 50%
Expirado
9
8%
Livre
Publicou: 2 artigos
2
Desenvolvedor 2
Classificação
(274)
Projetos
403
28%
Arbitragem
40
40% / 50%
Expirado
1
0%
Livre
3
Desenvolvedor 3
Classificação
(298)
Projetos
478
40%
Arbitragem
105
40% / 24%
Expirado
82
17%
Carregado
Publicou: 2 códigos

Informações sobre o projeto

Orçamento
100 - 200 USD
Prazo
de 1 para 2 dias