仕事が完了した

実行時間52 分
開発者からのフィードバック
Client is easy to work with. Very prompt and thorough, gives clear instruction and feedback

指定

Hello, I would like to create a bot using the Martingale strategy. Can you help me?

Let me first outline the simplest conditions:

- No trades are opened at 23:00.
- Buy and Sell are managed separately.
- When there are no open trades, Buy and Sell are opened simultaneously.
This is the starting condition for the Martingale each time.

GRID:

I would like to choose the size of the Martingale by modifying a parameter called "drawdown pips."
If "Drawdown pips" = 20, the Martingale will continue every 20 pips of drawdown.
This parameter should be adjustable.

The Martingale (2 trades or more) is closed when the average price is in a profit of 4 pips.
This parameter should be adjustable.

IMPORTANT: If there is only one Sell (or only one Buy) open, it should be closed at the opening of the next Buy or Sell and NOT AT 4 PIPS TP (and a new one is opened).

If there are open Buy and Sell trades, and the price rises by 20 pips, when the second operation (Sell) is opened, the Buy in profit is closed, and a new one is opened.

We will reach a point where the Sell Martingale ends, and the Buy Martingale begins. The next Sell will be opened together with the next Buy.

For each new Buy opened in the following Martingale, a Sell is opened and closed at next buy.

So, every time the Martingale continues, the trade of the opposite sign is closed and reopened every 20 pips.

By doing this, there can never be 2 Buys and 2 Sells simultaneously.



応答済み

1
開発者 1
評価
(250)
プロジェクト
400
38%
仲裁
82
41% / 20%
期限切れ
69
17%
取り込み中
2
開発者 2
評価
(787)
プロジェクト
1354
72%
仲裁
110
27% / 48%
期限切れ
340
25%
取り込み中
3
開発者 3
評価
(144)
プロジェクト
230
60%
仲裁
3
67% / 0%
期限切れ
6
3%
4
開発者 4
評価
(56)
プロジェクト
83
22%
仲裁
1
100% / 0%
期限切れ
1
1%
仕事中
類似した注文
Fidjd bhhyh 30 - 300 USD
Definisci qui le tue specifiche dei requisiti, punto per punto. Descrivi le tue esigenze in modo breve e chiaro, affinché il potenziale sviluppatore sia in grado di valutare correttamente la complessità dell'ordine e il suo costo, nonché il tempo di esecuzione richiesto. Una descrizione sbagliata o troppo generica potrebbe far sì che il tuo ordine venga ignorato, e potrebbe comportare un allungamento eccessivo dei

プロジェクト情報

予算
30 - 100 USD
VAT(付加価値税) (22%): 6.6 - 22 USD
合計: 36.6 - 122 USD
開発者用
27 - 90 USD