Tarea técnica

  1. The overbought zone is determined as candlesticks, at which the indicator value Value > Lmax (Lmax=-20).
  2. The oversold zone is determined as candlesticks, at which the indicator value Value < Lmin (Lmin=-80).
  3. The values of Lmax and Lmin should be included in indicator parameters.
  4. A yellow point should be added at the High point of candlesticks in the overbought zone—it is the H point.
  5. A green point should be added at the Low point of candlesticks in the oversold zone—it is the L point.
  6. If there is at least one L point between two H points, search for a LL point in the interval between two H points. The candlestick with the lowest Low price will be the LL point. Generally, the LL point is not necessarily an L point. Search for candlesticks with the lowest Low price.
  7. If there is at least one H point between two L points, search for a HH point in the interval between two L points. The candlestick with the highest High price will be the HH point. Generally, the HH point is not necessarily a H point. Search for candlesticks with the highest High price.
  8. Connect LL and HH points to draw a ZigZag. The default color is yellow. The first step is finished.

Han respondido

1
Desarrollador 1
Evaluación
(19)
Proyectos
24
8%
Arbitraje
9
33% / 33%
Caducado
1
4%
Trabajando
2
Desarrollador 2
Evaluación
(11)
Proyectos
18
17%
Arbitraje
3
33% / 67%
Caducado
3
17%
Libre
3
Desarrollador 3
Evaluación
(2)
Proyectos
3
0%
Arbitraje
8
13% / 88%
Caducado
1
33%
Libre
4
Desarrollador 4
Evaluación
(6)
Proyectos
5
0%
Arbitraje
4
25% / 75%
Caducado
2
40%
Libre
5
Desarrollador 5
Evaluación
(27)
Proyectos
30
37%
Arbitraje
0
Caducado
3
10%
Libre
6
Desarrollador 6
Evaluación
(268)
Proyectos
601
34%
Arbitraje
64
20% / 58%
Caducado
147
24%
Trabaja
Ha publicado: 1 artículo, 22 ejemplos
7
Desarrollador 7
Evaluación
(314)
Proyectos
562
35%
Arbitraje
81
31% / 44%
Caducado
205
36%
Trabaja
8
Desarrollador 8
Evaluación
(25)
Proyectos
31
32%
Arbitraje
0
Caducado
2
6%
Trabaja
9
Desarrollador 9
Evaluación
(77)
Proyectos
244
74%
Arbitraje
7
100% / 0%
Caducado
1
0%
Libre
Ha publicado: 1 artículo
10
Desarrollador 10
Evaluación
(1)
Proyectos
1
0%
Arbitraje
0
Caducado
0
Libre
11
Desarrollador 11
Evaluación
(574)
Proyectos
945
47%
Arbitraje
309
58% / 27%
Caducado
125
13%
Libre
12
Desarrollador 12
Evaluación
(510)
Proyectos
977
74%
Arbitraje
27
19% / 67%
Caducado
100
10%
Libre
Ha publicado: 1 artículo, 6 ejemplos
13
Desarrollador 13
Evaluación
(298)
Proyectos
477
40%
Arbitraje
105
40% / 24%
Caducado
81
17%
Trabajando
Ha publicado: 2 ejemplos
14
Desarrollador 14
Evaluación
Proyectos
0
0%
Arbitraje
0
Caducado
0
Libre
15
Desarrollador 15
Evaluación
(2)
Proyectos
3
0%
Arbitraje
1
100% / 0%
Caducado
0
Libre
Solicitudes similares
ALRT 100+ USD
# Project Requirements – Sierra Chart to MT5 Integrated Alerts *Scope:* The project must be a *fully integrated system* including both: 1. *Sierra Chart ACSIL sender* – writes alerts to JSON. 2. *MT5 EA (Listener)* – reads JSON alerts and executes trades in MT5. The system must handle alerts *from Sierra Chart to MT5 execution* completely, not just file sending. *Duplicate Alert Detection:* - Use
I need an Ai trading bot for Binance and BTC on MT5 that also uses order flow data. It should also make use of TSI- Temporal indicator sampling and also it should make use of fundamental analysis in the process of signal generation
Live chart [ expert is not executing trades on xauusd ] , Deleting Existing Parameter not in use , Live Chart Adjustments Only , No Need to Change anything else , expert will be live testing Throughout
Prepare expert for xauusd live chart [ expert is not executing trades on xauusd ] . Deletion and cleaning code . Trailing Stop Rule to follow the given method . Live Chart Only

Información sobre el proyecto

Presupuesto
30+ USD
Plazo límite de ejecución
de 5 a 10 día(s)