Spécifications

  1. The overbought zone is determined as candlesticks, at which the indicator value Value > Lmax (Lmax=-20).
  2. The oversold zone is determined as candlesticks, at which the indicator value Value < Lmin (Lmin=-80).
  3. The values of Lmax and Lmin should be included in indicator parameters.
  4. A yellow point should be added at the High point of candlesticks in the overbought zone—it is the H point.
  5. A green point should be added at the Low point of candlesticks in the oversold zone—it is the L point.
  6. If there is at least one L point between two H points, search for a LL point in the interval between two H points. The candlestick with the lowest Low price will be the LL point. Generally, the LL point is not necessarily an L point. Search for candlesticks with the lowest Low price.
  7. If there is at least one H point between two L points, search for a HH point in the interval between two L points. The candlestick with the highest High price will be the HH point. Generally, the HH point is not necessarily a H point. Search for candlesticks with the highest High price.
  8. Connect LL and HH points to draw a ZigZag. The default color is yellow. The first step is finished.

Répondu

1
Développeur 1
Évaluation
(19)
Projets
24
8%
Arbitrage
9
33% / 33%
En retard
1
4%
Chargé
2
Développeur 2
Évaluation
(11)
Projets
18
17%
Arbitrage
3
33% / 67%
En retard
3
17%
Gratuit
3
Développeur 3
Évaluation
(2)
Projets
3
0%
Arbitrage
8
13% / 88%
En retard
1
33%
Gratuit
4
Développeur 4
Évaluation
(6)
Projets
5
0%
Arbitrage
4
25% / 75%
En retard
2
40%
Gratuit
5
Développeur 5
Évaluation
(27)
Projets
30
37%
Arbitrage
0
En retard
3
10%
Gratuit
6
Développeur 6
Évaluation
(268)
Projets
601
34%
Arbitrage
64
20% / 58%
En retard
147
24%
Travail
Publié : 1 article, 22 codes
7
Développeur 7
Évaluation
(314)
Projets
562
35%
Arbitrage
81
31% / 44%
En retard
205
36%
Travail
8
Développeur 8
Évaluation
(25)
Projets
31
32%
Arbitrage
0
En retard
2
6%
Travail
9
Développeur 9
Évaluation
(77)
Projets
244
74%
Arbitrage
7
100% / 0%
En retard
1
0%
Gratuit
Publié : 1 article
10
Développeur 10
Évaluation
(1)
Projets
1
0%
Arbitrage
0
En retard
0
Gratuit
11
Développeur 11
Évaluation
(574)
Projets
945
47%
Arbitrage
309
58% / 27%
En retard
125
13%
Gratuit
12
Développeur 12
Évaluation
(510)
Projets
977
74%
Arbitrage
27
19% / 67%
En retard
100
10%
Gratuit
Publié : 1 article, 6 codes
13
Développeur 13
Évaluation
(298)
Projets
477
40%
Arbitrage
105
40% / 24%
En retard
81
17%
Chargé
Publié : 2 codes
14
Développeur 14
Évaluation
Projets
0
0%
Arbitrage
0
En retard
0
Gratuit
15
Développeur 15
Évaluation
(2)
Projets
3
0%
Arbitrage
1
100% / 0%
En retard
0
Gratuit
Commandes similaires
ALRT 100+ USD
# Project Requirements – Sierra Chart to MT5 Integrated Alerts *Scope:* The project must be a *fully integrated system* including both: 1. *Sierra Chart ACSIL sender* – writes alerts to JSON. 2. *MT5 EA (Listener)* – reads JSON alerts and executes trades in MT5. The system must handle alerts *from Sierra Chart to MT5 execution* completely, not just file sending. *Duplicate Alert Detection:* - Use
I need an Ai trading bot for Binance and BTC on MT5 that also uses order flow data. It should also make use of TSI- Temporal indicator sampling and also it should make use of fundamental analysis in the process of signal generation
Live chart [ expert is not executing trades on xauusd ] , Deleting Existing Parameter not in use , Live Chart Adjustments Only , No Need to Change anything else , expert will be live testing Throughout
Prepare expert for xauusd live chart [ expert is not executing trades on xauusd ] . Deletion and cleaning code . Trailing Stop Rule to follow the given method . Live Chart Only

Informations sur le projet

Budget
30+ USD
Délais
de 5 à 10 jour(s)