Trabajo finalizado
Plazo de ejecución 12 minutos
Tarea técnica
This expert is for breakout trades of the 3 sessions - probably Asia, Europe, US.
The high and low of the former session should be used for breakout trades. Every session is optional and can be deactivated.
In case the candle - in the current timeframe - is breaking above the high or below the low of the last session, enter trade in direction.
Breaking the level can be defined as closing the candle above/below the level or just crossing the level for xx pips.
The stoploss should be the ATR or the low (for long) and high (for short) of the former session. In case of the 1st session (asia) the 3rd session from the day before is used.
Sourcecode needs to be provided after payment.
Sessions:
- define session 1:
- hh:mm to hh:mm
- trade session 1:
- yes (which means, use the high/low of US session yesterday)
- no
- define session 2:
- hh:mm to hh:mm
- trade session 2:
- yes (which means, use the high/low of the Asia session today)
- no
- define session 3:
- hh:mm to hh:mm
- trade session 3:
- yes (which means, use the high/low of the EU session today)
- no
Trade:
- Lotsize:
- fixed lot
- percentage of equity
- enter trade as:
- price crosses high/low (plus xx pips)
- candle closes above last session high/below last session low
- stop loss:
- atr
- high/low of former session
- take profit 1:
- xx pips
- 0/empty for no TP
- closing position:
- close same day at hh:mm
- 0/empty for not closing the trade
Breakeven:
- use break even:
- yes
- no
- break even travel:
- in pips
- break even-bonus:
- in pips (entry price plus xx pips as new stoploss)
Han respondido
1
Evaluación
Proyectos
1758
61%
Arbitraje
14
64%
/
7%
Caducado
82
5%
Libre
2
Evaluación
Proyectos
0
0%
Arbitraje
0
Caducado
0
Libre
3
Evaluación
Proyectos
16
19%
Arbitraje
0
Caducado
0
Libre
4
Evaluación
Proyectos
463
34%
Arbitraje
24
42%
/
46%
Caducado
6
1%
Libre
5
Evaluación
Proyectos
518
32%
Arbitraje
23
65%
/
9%
Caducado
15
3%
Libre
6
Evaluación
Proyectos
1391
45%
Arbitraje
46
72%
/
13%
Caducado
35
3%
Libre
7
Evaluación
Proyectos
494
52%
Arbitraje
10
60%
/
20%
Caducado
3
1%
Libre
8
Evaluación
Proyectos
2596
62%
Arbitraje
112
45%
/
26%
Caducado
417
16%
Trabaja
9
Evaluación
Proyectos
922
48%
Arbitraje
300
59%
/
25%
Caducado
123
13%
Trabajando
10
Evaluación
Proyectos
398
38%
Arbitraje
82
41%
/
20%
Caducado
69
17%
Ocupado
11
Evaluación
Proyectos
2977
65%
Arbitraje
76
47%
/
14%
Caducado
340
11%
Libre
Información sobre el proyecto
Presupuesto
30 - 100 USD
Para el ejecutor
27
- 90
USD