Adding ATR bands to the Zerolag Hull variation MT4 indicator

Job finished

Execution time 40 minutes
Feedback from customer
Satisfied with the service from John
Feedback from employee
Great customer, prompt communication, clear specs, recommended+

Specification

Please assist in modifying the attached indicator - Zerolag hull variation according to the following requirements;

1. Add ATR bands to the Zerolag Hull variation mt4 indicator.

2. The bands should have their own period setting

3. Both upper and lower band should be visible


Responded

1
Developer 1
Rating
(126)
Projects
151
48%
Arbitration
6
83% / 17%
Overdue
2
1%
Free
2
Developer 2
Rating
(93)
Projects
133
35%
Arbitration
13
38% / 31%
Overdue
32
24%
Free
3
Developer 3
Rating
(332)
Projects
485
40%
Arbitration
82
11% / 63%
Overdue
77
16%
Free
Published: 1 code
4
Developer 4
Rating
(295)
Projects
472
40%
Arbitration
102
40% / 24%
Overdue
78
17%
Busy
Published: 2 codes
5
Developer 5
Rating
(261)
Projects
276
55%
Arbitration
0
Overdue
5
2%
Free
6
Developer 6
Rating
(70)
Projects
91
25%
Arbitration
26
19% / 54%
Overdue
25
27%
Free
Similar orders
step by step and structure this into a full IEEE 830 / ISO/IEC/IEEE 29148 style Requirements Specification. This format will include: Introduction System Overview Functional and Performance Requirements Traceability Matrix (linking requirements to test cases) Verification and Validation Compliance Standards 1. Introduction 1.1 Purpose The purpose of this document is to define the technical requirements for the
1.Sinyal Perdagangan : Sinyal beli: garis MACD utama memotong garis sinyal ke atas (macd_current>signal_current && macd_previous<signal_previous). Sinyal jual: garis MACD utama memotong garis sinyal ke bawah (macd_current<signal_current && macd_previous>signal_previous). Gambar di bawah menunjukkan kasus beli dan jual. 2. Posisi ditutup pada sinyal yang berlawanan: Posisi beli ditutup pada sinyal jual, dan posisi

Project information

Budget
30+ USD
Deadline
from 1 to 2 day(s)