Amend current EA to build in take profit and stop loss in total for the EA in equity

MQL5 Experten Skripte

Auftrag beendet

Ausführungszeit 5 Tage

Spezifikation

Hi there

I have an EA (Send Buy & Sell - attached) that I want to make a change to.

This EA allows you to place 2 trades on the same currency pair in different directions (buy and sell) at the same time. For each of the trades (buy and sell side) you can place a limit and stop in pips.  

I want added to that a stop loss and limit in value / equity / deposit currency for the 2 trades combined. 

 

So I will have the option to choose a stop loss or limit for each transaction as it is currently OR

the option to type in the stop loss in $ (equity) terms for the combined loss for the 2 trades and type in the target combined limit (profit) in $ (equity) terms.

e.g. I choose to type in the stop loss - lets say -$500 and the limit +$750.

Both the long and short trade is closed when the combined profit on the 2 trades reaches +$750 or the combined loss on the 2 trades reaches -$500.

 

Why:

 I want to increase my trading volume but keep my overall leverage low (i.e. buy 20 lots and sell 19 lots = effectively 1 lot in the market). The variable spreads however means I need to close both the long and the short trade at exactly the same time in order to keep my effective leverage low and not risk an overleveraged naked position.  

Dateien:

Bewerbungen

1
Entwickler 1
Bewertung
(1156)
Projekte
1462
63%
Schlichtung
21
57% / 10%
Frist nicht eingehalten
43
3%
Frei
2
Entwickler 2
Bewertung
(25)
Projekte
36
17%
Schlichtung
14
14% / 57%
Frist nicht eingehalten
3
8%
Frei
3
Entwickler 3
Bewertung
(49)
Projekte
74
18%
Schlichtung
30
17% / 53%
Frist nicht eingehalten
31
42%
Frei
4
Entwickler 4
Bewertung
(647)
Projekte
1295
67%
Schlichtung
84
26% / 49%
Frist nicht eingehalten
338
26%
Frei
5
Entwickler 5
Bewertung
(772)
Projekte
1039
44%
Schlichtung
50
8% / 50%
Frist nicht eingehalten
116
11%
Frei
6
Entwickler 6
Bewertung
(68)
Projekte
111
26%
Schlichtung
17
6% / 71%
Frist nicht eingehalten
15
14%
Frei
Veröffentlicht: 9 Beispiele

Projektdetails

Budget
10 - 30 USD
Ausführungsfristen
von 1 bis 5 Tag(e)