Line on chart for specific level

Работа завершена

Время выполнения 9 минут
Отзыв от заказчика
Highly recommend!!! Very professional and extremely helpful!

Техническое задание

Hello,

There are 2 thing I need your help. 

1.I have a file with date, time and Level1 and Level2.

Example:

Date Time Level1 Level2  Type

2012.05.12  00:00 1.5236 1.5500 1

...

There are 4 type.

I want your help to write a script that will draw 2 small horizontal line (see picture) associated with the 2 levels on that date/time.

I should be able to change color, size of the line.

I should be able to turn off a certain type.

 

2. I have file with Only date/time and type

Date Time Type

2012.05.12  00:00 1

... 

There are 4 type. 

I want a script that draw a vertical line from the High to Low of this bar.

I should be able to change color, size of the line.

I should be able to turn off a certain type.  

That's all I need.

Thank you,

HHC 

Откликнулись

1
Разработчик 1
Оценка
(1235)
Проекты
2820
80%
Арбитраж
156
22% / 43%
Просрочено
487
17%
Свободен
2
Разработчик 2
Оценка
(15)
Проекты
65
58%
Арбитраж
6
17% / 33%
Просрочено
39
60%
Свободен
3
Разработчик 3
Оценка
Проекты
2
100%
Арбитраж
0
Просрочено
0
Свободен
4
Разработчик 4
Оценка
(47)
Проекты
140
49%
Арбитраж
9
56% / 0%
Просрочено
27
19%
Свободен
5
Разработчик 5
Оценка
(195)
Проекты
395
28%
Арбитраж
155
20% / 52%
Просрочено
112
28%
Свободен
6
Разработчик 6
Оценка
(82)
Проекты
150
29%
Арбитраж
9
44% / 11%
Просрочено
46
31%
Свободен
7
Разработчик 7
Оценка
(63)
Проекты
80
28%
Арбитраж
17
12% / 76%
Просрочено
48
60%
Свободен
8
Разработчик 8
Оценка
(18)
Проекты
37
43%
Арбитраж
6
17% / 50%
Просрочено
17
46%
Свободен
9
Разработчик 9
Оценка
Проекты
0
0%
Арбитраж
0
Просрочено
0
Свободен

Информация о проекте

Бюджет
20- USD
Сроки выполнения
до 1 дн.