Tarea técnica

step by step and structure this into a full IEEE 830 / ISO/IEC/IEEE 29148 style Requirements Specification. This format will include:

  • Introduction

  • System Overview

  • Functional and Performance Requirements

  • Traceability Matrix (linking requirements to test cases)

  • Verification and Validation

  • Compliance Standards

1. Introduction

1.1 Purpose
The purpose of this document is to define the technical requirements for the development, deployment, and acceptance of an Autonomous Mobile Robot (AMR) for indoor industrial applications.

1.2 Scope
This specification applies to the design, integration, and testing of the AMR system to ensure it meets the defined operational, performance, and safety requirements.

1.3 Definitions and Acronyms

  • AMR: Autonomous Mobile Robot

  • FAT: Factory Acceptance Testing

  • SAT: Site Acceptance Testing

  • HMI: Human-Machine Interface

  • MTBF: Mean Time Between Failures


2. System Overview

The AMR is intended to perform autonomous tasks within an industrial environment. It will navigate a predefined map, perform material handling, and detect both static and dynamic obstacles. The robot will feature manual override and emergency stop functions to ensure operator safety.


3. System Requirements

3.1 Functional Requirements

FR-1: Autonomous Navigation
The robot shall autonomously navigate using sensor fusion (LiDAR, IMU, wheel encoders) and localize itself within a mapped environment.

FR-2: Obstacle Detection and Path Replanning
The robot shall detect static and dynamic obstacles, and replan its path with a response time of ≤100 ms.

FR-3: Human-Machine Interaction
The system shall allow manual control and override via an HMI. Emergency stop functions shall immediately halt all operations.

FR-4: Task Execution
The robot shall execute predefined tasks (e.g., material transport) autonomously and return to a charging station when required.

3.2 Performance Requirements

PR-1: Payload Capacity
The robot shall support a minimum payload of 10 kg.

PR-2: Maximum Velocity
The robot shall operate at a maximum velocity of 1.5 m/s.

PR-3: Operational Availability
The robot shall achieve an operational availability of 99%, factoring in preventive maintenance.

PR-4: Positional Accuracy
The system shall achieve a localization accuracy of ±5 mm using sensor fusion techniques.

3.3 Hardware Requirements

HR-1: Safety Sensors
The robot shall include redundant safety sensors (LiDAR, ultrasonic, etc.) to ensure human safety in the vicinity.

HR-2: Power and Endurance
The robot shall be powered by rechargeable batteries, providing at least 8 hours of continuous operation under full load.

HR-3: Computational Resources
The robot shall be equipped with a processing unit capable of handling sensor fusion, localization, and obstacle avoidance algorithms in real-time.

3.4 Software Requirements

SW-1: Remote Monitoring and Diagnostics
The robot shall support remote software updates and diagnostics via secure communication protocols (Ethernet, Wi-Fi).

SW-2: Integration APIs
The robot shall provide documented APIs for integration with existing industrial systems (e.g., Warehouse Management Systems).


4. Verification and Validation

4.1 Factory Acceptance Testing (FAT)
FAT will verify that all functional and performance requirements are met before shipping. The following tests will be performed:

  • Navigation tests to verify autonomous operation.

  • Obstacle detection and path replanning accuracy.

  • Load and speed tests to verify performance.

4.2 Site Acceptance Testing (SAT)
SAT will validate robot operation within the specific industrial environment. Tests include:

  • Performance in the intended operating environment.

  • HMI interaction and manual override functionality.

  • Safety compliance verification.


5. Compliance Standards

The robot shall comply with the following standards:

  • ISO 10218: Safety Requirements for Industrial Robots

  • ISO 13849: Safety of Machinery – Safety-Related Parts of Control Systems

  • IEC 61508: Functional Safety of Electrical/Electronic/Programmable Electronic Safety-Related Systems

  • IEC 62061: Safety of Machinery – Functional Safety of Safety-Related Control Systems


6. Traceability Matrix

Req. ID Requirement Description Test Case ID Verification Method
FR-1 Autonomous navigation with sensor fusion TC-001 FAT – Autonomous Test
FR-2 Obstacle detection and path replanning TC-002 FAT – Obstacle Avoidance
FR-3 Manual control and emergency stop TC-003 SAT – Manual Override Test
FR-4 Task execution and charging TC-004 SAT – Task Sequence Test
PR-1 Payload capacity ≥ 10 kg TC-005 FAT – Load Test
PR-2 Max velocity ≤ 1.5 m/s TC-006 FAT – Speed Test
PR-3 Operational availability ≥ 99% TC-007 SAT – Uptime Test
HR-2 Battery endurance ≥ 8 hours TC-008 FAT – Battery Test

Han respondido

1
Desarrollador 1
Evaluación
(395)
Proyectos
556
41%
Arbitraje
30
57% / 3%
Caducado
57
10%
Libre
Ha publicado: 11 ejemplos
2
Desarrollador 2
Evaluación
(17)
Proyectos
21
19%
Arbitraje
5
40% / 40%
Caducado
0
Libre
3
Desarrollador 3
Evaluación
(636)
Proyectos
1007
47%
Arbitraje
33
36% / 36%
Caducado
99
10%
Trabaja
Ha publicado: 6 ejemplos
4
Desarrollador 4
Evaluación
(8)
Proyectos
11
0%
Arbitraje
8
25% / 75%
Caducado
2
18%
Libre
5
Desarrollador 5
Evaluación
Proyectos
0
0%
Arbitraje
0
Caducado
0
Libre
6
Desarrollador 6
Evaluación
(19)
Proyectos
22
18%
Arbitraje
9
33% / 44%
Caducado
3
14%
Trabaja
Ha publicado: 1 ejemplo
7
Desarrollador 7
Evaluación
Proyectos
0
0%
Arbitraje
0
Caducado
0
Libre
8
Desarrollador 8
Evaluación
(7)
Proyectos
5
0%
Arbitraje
5
0% / 80%
Caducado
1
20%
Trabaja
9
Desarrollador 9
Evaluación
(16)
Proyectos
35
23%
Arbitraje
4
0% / 50%
Caducado
2
6%
Trabaja
10
Desarrollador 10
Evaluación
(1)
Proyectos
2
0%
Arbitraje
1
0% / 100%
Caducado
0
Libre
Ha publicado: 2 ejemplos
11
Desarrollador 11
Evaluación
Proyectos
0
0%
Arbitraje
0
Caducado
0
Libre
12
Desarrollador 12
Evaluación
(45)
Proyectos
53
57%
Arbitraje
2
100% / 0%
Caducado
1
2%
Libre
Ha publicado: 5 ejemplos
13
Desarrollador 13
Evaluación
Proyectos
0
0%
Arbitraje
0
Caducado
0
Libre
14
Desarrollador 14
Evaluación
Proyectos
0
0%
Arbitraje
0
Caducado
0
Libre
Solicitudes similares
hello i need help building a ea bot for mt5 and i have started on claude but i will need someone if a incredible experience to make my ideas come to live. please contact so we can schedule a quick call and i can share anything that concerns you for the task
I DO NOT need any programming or strategy development. I already have a working NinjaTrader 8 automated strategy based on a 3/5 EMA crossover. I need you to run my existing strategy through NinjaTrader Strategy Analyzer/Optimizer, test the existing adjustable parameters, and find robust settings with the best profit factor and lowest reasonable drawdown. I will provide the existing NinjaScript ZIP. I do not want the
Project Description I am looking for an experienced MQL5/MT5 Expert Advisor developer to develop an automated trading EA for XAUUSD on the M3 timeframe , running on an Exness account . The EA will automate a manual strategy based on SNR/GAP zones , using two setup types: Price Rejection Price Correction The EA should identify valid BUY/SELL setups around predefined SNR/GAP areas, apply configurable RSI, SMA, EMA and
Indicador Maximas e Minimas + Super Trend O Indicador MAX/MIN é um indicador de análise técnica para o MetaTrader 5 , desenvolvido para ajudar você a identificar regiões importantes de preço e possíveis oportunidades de compra e venda. O que ele faz MAX/MIN: identifica máximas e mínimas relevantes do mercado e mostra os preços no gráfico. HH / HL / LH / LL: ajuda a visualizar a estrutura do mercado, mostrando quando
Hi i need help to connect my chat gtp with ninja trader I have all tools. Just need supervision and seeking a professional who can do that for me. This the bridge extension https://crosstrade.io/blog/chatgpt-to-ninjatrader-mcp-walkthrough

Información sobre el proyecto

Presupuesto
30 - 100 USD
Plazo límite de ejecución
de 1 a 10 día(s)