工作已完成
执行时间19 小时
指定
Integration indicators.
I wish to integrate two indicators to work two in one (a single file).
to add the file in the graph show the two indicators in the graph
Integration indicators.
I wish to integrate two indicators to work two in one (a single file).
to add the file in the graph show the two indicators in the graph
反馈
1
等级
项目
1813
61%
仲裁
14
64%
/
7%
逾期
84
5%
空闲
项目信息
预算
10 USD
截止日期
从 1 到 2 天