I'd like to make changes to an existing EA. I require the adding of pyramid entries.

MQL4 专家 脚本

工作已完成

执行时间3 天
客户反馈
This is my first project. Its excellent delivery... I'm very happy... He is truly outstanding. I'll give him five stars. I am confident that he is the best expert in mql. Many thanks.

指定

I'd like to make changes to an existing EA. I require the adding of pyramid entries.

Grid Entries are the current EA entries....I'd like to add Pyramid entries.

1.       Pyramid wants to allow the condition:  Breakout the buy entry price after buy entry and sell entry failure to meet the modified TP = buy entries

((Similar to sell entries)

 

2.       Additionally the condition 3 failure  [1. buy(grid) ,2.sell( grid)and3. buy (pyramid) ] price breakout below sell price = sell entries (similar to buy entries)

 

New additional Entries = Pyramid Entries

Pyramid entries = detailed image attached

 

Example –Image attached

Requirements in the setting:

1.       Current EA = True/false

2.       Pyramid Entries = true/false

3.       Pyramid  pip gap  = xx (gap points)

4.       Pyramid  Multiplier = xx

5.       Pyramid initial lot = xx

6.       Pyramid entries = start from continuous lot size/initial lot

Continuous lot size = already opened lot at present (ex: 0.01, 0.02, 0.04, 0.08) start from 0.16

Initial lot = already opened lot at present 0.08 (ex: 0.01, 0.02, 0.04, 0.08) start from 0.01

7.       Spread = xx

8.       Slippage = xx

9.       Grid Entries Draw down Limit = xx  ( entries allowed)

10.   Pyramid entries Draw down limit = xx

11.   Maximum draw down limit  = xx

The above 3 Draw down shown in the display

Grid Entries:

If reach the Maximum draw down xx % - further no trade taken in grid entries

Pyramid Entries:

If reach the Maximum draw down xx % - further no trade taken in grid entries

Modified TP = same as in the EA

Put different magic number for buy and sell

 


附加的文件:

反馈

1
开发者 1
等级
(3)
项目
1
0%
仲裁
5
0% / 100%
逾期
0
空闲
2
开发者 2
等级
(3)
项目
4
0%
仲裁
2
0% / 100%
逾期
1
25%
空闲
3
开发者 3
等级
(9)
项目
20
10%
仲裁
4
50% / 50%
逾期
5
25%
空闲
4
开发者 4
等级
(31)
项目
41
20%
仲裁
9
11% / 89%
逾期
5
12%
空闲
5
开发者 5
等级
(1)
项目
1
0%
仲裁
0
逾期
0
空闲

项目信息

预算
80 - 83 USD
截止日期
 1  20 天