Draw line of chart and collect information

MQL4 Indicators Scripts

Job finished

Execution time 40 minutes
Feedback from customer
Work with him on several occasions. He is very helpful and willing to help even after the job is closed.

Specification

Hello guys,

I need your help on 2 separate scripts:

 

1.     On a plain chart, I have color vertical line. I want to collect time and date for each vertical line (bar 0) and 3 bar prior to it (bar -1,-2.-3)

The output file in scv should be:

Bar 0_date        Bar0_time         Bar0_Color_code                    bar -1               bar -2 bar-3

 

There are 6 colors of the vertical line and I should be able to assign code (in output file) for each color.

 

---------------------

2.     I have a scv file the following setting:

Date                     Time                              Long_Short        Color

2012.05.06         12:00                                 1                      2

.....

..... 

 Long_short has 2 possible value: 1/0 (1 Long and 0 short)

Color have value: 1,2,3,4,5,6

 

I want to draw a vertical line on charts for each time and date.

I should be able to choose whether line draw for only a supset of the data based on Long_short and color. For example, draw only Long (code 1) and color code 2. 

I should be able to assign color to each value.

 

That's all.

Thank you,

 HHC 

Responded

1
Developer 1
Rating
(195)
Projects
395
28%
Arbitration
155
20% / 52%
Overdue
112
28%
Free
2
Developer 2
Rating
(187)
Projects
367
56%
Arbitration
45
22% / 56%
Overdue
188
51%
Free
Published: 1 article, 6 codes
3
Developer 3
Rating
(15)
Projects
65
58%
Arbitration
6
17% / 33%
Overdue
39
60%
Free
4
Developer 4
Rating
(564)
Projects
845
73%
Arbitration
15
53% / 13%
Overdue
193
23%
Free
5
Developer 5
Rating
Projects
0
0%
Arbitration
0
Overdue
0
Free
6
Developer 6
Rating
(73)
Projects
257
53%
Arbitration
16
50% / 38%
Overdue
83
32%
Free
7
Developer 7
Rating
(9)
Projects
16
19%
Arbitration
1
0% / 100%
Overdue
5
31%
Free
8
Developer 8
Rating
(26)
Projects
45
29%
Arbitration
2
0% / 50%
Overdue
21
47%
Free
9
Developer 9
Rating
(510)
Projects
977
74%
Arbitration
27
19% / 67%
Overdue
100
10%
Working
Published: 1 article, 6 codes
10
Developer 10
Rating
(63)
Projects
80
28%
Arbitration
17
12% / 76%
Overdue
48
60%
Free
11
Developer 11
Rating
Projects
0
0%
Arbitration
0
Overdue
0
Free
12
Developer 12
Rating
Projects
0
0%
Arbitration
0
Overdue
0
Free
Published: 1 code
13
Developer 13
Rating
(47)
Projects
140
49%
Arbitration
9
56% / 0%
Overdue
27
19%
Free
14
Developer 14
Rating
Projects
0
0%
Arbitration
0
Overdue
0
Free
15
Developer 15
Rating
(1235)
Projects
2820
80%
Arbitration
156
22% / 43%
Overdue
487
17%
Free
16
Developer 16
Rating
Projects
0
0%
Arbitration
0
Overdue
0
Free
17
Developer 17
Rating
Projects
0
0%
Arbitration
0
Overdue
0
Free

Project information

Budget