TREND ENHANCE EA

MQL4 전문가

작업 종료됨

실행 시간 18 일
고객의 피드백
Best coder of the world!
피고용인의 피드백
👍🏼🤝

명시

START EA WITH A MASTER ORDER, 1 LOT

MASTER BUY ORDER IF SIMPLE MOVING AVERAGE 100(1) > SIMPLE MOVING AVERAGE 100(10) AND SIMPLE MOVING AVERAGE 100 (10) -SIMPLE MOVING AVERAGE 100(1) IS > 2     OR

MASTER SELL ORDER IF SIMPLE MOVING AVERAGE 100(1) < SIMPLE MOVING AVERAGE 100(10) AND SIMPLE MOVING AVERAGE 100 (1) -SIMPLE MOVING AVERAGE 100(10) IS >2.

 

FOR ORDER MASTER, EVERY CANDLE VERIFY:

IF SIMPLE MOVING AVERAGE 100(1) > SIMPLE MOVING AVERAGE 100(10) AND SIMPLE MOVING AVERAGE 100 (10) -SIMPLE MOVING AVERAGE 100(1) IS > 2 : HOLD MASTER ORDER

IF NOT: CLOSE ALL OPENED ORDER (MASTER AND SECONDARY) AND OPEN NEW MASTER ORDER IN OPPOSITE DIRECTON

IF SIMPLE MOVING AVERAGE 100(1) > SIMPLE MOVING AVERAGE 100(10) AND SIMPLE MOVING AVERAGE 100 (10) -SIMPLE MOVING AVERAGE 100(1) IS > 2: HOLD MASTER ORDER

IF NOT: CLOSE ALL OPENED ORDER (MASTER AND SECONDARY) AND OPEN NEW MASTER ORDER IN OPPOSITE DIRECTON

 

SECONDARY ORDER :

VERIFY CLOSE CANDLE AND IF THERE ARE OPENED SECONDARY ORDER:

(MAX RUNNING MASTER ORDER: 1

MAX RUNNING SECONDARY ORDER: 1)

IF THERE ISN’T OPENED SECONDARY BUY OR SELL ORDER AND IF MASTER ORDER IS MASTER BUY ORDER AND CLOSE CANDLE PRICE IS > UPPER BOLLINGER BANDS 100 S.D. 1.5 AND CLOSE PRICE IF > OF OPENED MASTER ORDER, THAN OPEN SELL SECONDARY ORDER.

TARGET PRICE OF SELL SECONDARY ORDER IS THE UPPER BOLLINGER BANDS 100 S.D. 1 (TRAILING EACH CANDLE).

IF THERE ISN’T OPENED SECONDARY BUY OR SELL ORDER AND IF MASTER ORDER IS A MASTER SELL ORDER AND CLOSE CANDLE PRICE IS < LOWER BOLLINGER BANDS 100 S.D. 1.5 AND CLOSE PRICE IF < OF OPENED MASTER ORDER, THAN OPEN BUY SECONDARY ORDER.

TARGET PRICE OF BUY SECONDARY ORDER IS THE LOWER BOLLINGER BANDS 100 S.D. 1 (TRAILING EACH CANDLE).

 

EA MUST HAVE A TIME/DATE TRADE FILTER.


파일:

JPG
Cattura.JPG
399.1 Kb

응답함

1
개발자 1
등급
(71)
프로젝트
115
52%
중재
4
25% / 75%
기한 초과
15
13%
작업중
2
개발자 2
등급
(67)
프로젝트
102
54%
중재
3
0% / 67%
기한 초과
9
9%
작업중
3
개발자 3
등급
(250)
프로젝트
400
38%
중재
82
41% / 20%
기한 초과
69
17%
로드됨

프로젝트 정보

예산
30+ USD
VAT (22%): 6.6 USD
총: 36.6 USD
개발자에게
27 USD