Solo gli utenti che hanno acquistato o noleggiato il prodotto possono lasciare commenti
patrickdrew  

Thanks for this.

Would you say min balance / 0.01 should be the 3000 you started with or 1000 or even less? 

I note you have "Dynamic Lot calculation." 

Are you results based on Fixed or dynamic lot? 

Michael Prescott Burney  
patrickdrew #:

Thanks for this.

Would you say min balance / 0.01 should be the 3000 you started with or 1000 or even less? 

I note you have "Dynamic Lot calculation." 

Are you results based on Fixed or dynamic lot? 


Minimum balance for 0.01 lot:
For optimal breathing room, I recommend $3000 per 0.01 if running dynamic lot sizing and allowing the system to fully operate as designed.
It can run on $1000 per 0.01, but drawdown tolerance and flexibility will be tighter.

Results:
My primary testing is done using dynamic lot calculation, as that reflects the intended risk management model. Fixed lot testing is also performed for baseline comparison, but dynamic is the core framework.

Also, a major update is about to drop that levels up the entire program.

Execution is being refined, stops are becoming more advanced, and TP structure is being rebuilt around significantly stronger RR profiles. should be up here shortly :)