Tâche terminée
Temps d'exécution 1 jour
Commentaires du client
Professional, Good work & very fast response
Commentaires de l'employé
A great customer, it was nice to work with a nice person!
Thank you very much for a very interesting order!
Spécifications
Put a multi time frame indicator (m1, m5, m15, m30, h1, h4, d1, MN) on one chart. And can choose which time frame to use. There are 3 indicators, each can be like that. And previously the indicator needs to be modified first, because there is a need to be removed or added. Existing example is 4 time frame and made into 9 time frame. 2 indicators I have source, and 1 more indicator only ex4 file (this file should be much added and discussed). And required to be completed within 3 days the longest
Regards,
Répondu
1
Évaluation
Projets
1123
43%
Arbitrage
47
49%
/
23%
En retard
84
7%
Gratuit
2
Évaluation
Projets
52
52%
Arbitrage
6
0%
/
100%
En retard
18
35%
Gratuit
Publié : 1 article
3
Évaluation
Projets
74
26%
Arbitrage
30
10%
/
63%
En retard
22
30%
Gratuit
4
Évaluation
Projets
12
25%
Arbitrage
0
En retard
5
42%
Gratuit
5
Évaluation
Projets
118
17%
Arbitrage
44
23%
/
39%
En retard
20
17%
Gratuit
6
Évaluation
Projets
193
61%
Arbitrage
7
14%
/
29%
En retard
2
1%
Gratuit
Publié : 3 codes
7
Évaluation
Projets
95
28%
Arbitrage
20
25%
/
55%
En retard
24
25%
Gratuit
8
Évaluation
Projets
21
19%
Arbitrage
7
0%
/
71%
En retard
14
67%
Gratuit
9
Évaluation
Projets
945
47%
Arbitrage
309
58%
/
27%
En retard
125
13%
Gratuit
Commandes similaires
Robot Requirements Specification
30 - 100 USD
step by step and structure this into a full IEEE 830 / ISO/IEC/IEEE 29148 style Requirements Specification. This format will include: Introduction System Overview Functional and Performance Requirements Traceability Matrix (linking requirements to test cases) Verification and Validation Compliance Standards 1. Introduction 1.1 Purpose The purpose of this document is to define the technical requirements for the
1.Sinyal Perdagangan : Sinyal beli: garis MACD utama memotong garis sinyal ke atas (macd_current>signal_current && macd_previous<signal_previous). Sinyal jual: garis MACD utama memotong garis sinyal ke bawah (macd_current<signal_current && macd_previous>signal_previous). Gambar di bawah menunjukkan kasus beli dan jual. 2. Posisi ditutup pada sinyal yang berlawanan: Posisi beli ditutup pada sinyal jual, dan posisi
Informations sur le projet
Budget
50 - 200 USD
Délais
de 2 à 3 jour(s)