Bollinger+PriceActionEA with custom risk management

MQL5 Experts

Job finished

Execution time 11 days

Specification

hello. 

i would like a quote for a mt5 expert advisor using standard bollinger bands. I need it to backtest the system against many currencies and stocks on different timeframes which i will select manually.

1st money management variables:


'capital': standard 1000
'risk_percentage_of_capital': standard 5%

variable risk management that enables me to lower my risk percentage by 'DropRiskPerc' every 'riskMNGMTtradeNUMBER' trades, but only if the capital grows at least riskMNGMTtradeGainMin percent in the sum of all the 'riskMNGMTtradeNUMBER' trades. Also i dont want the risk percentage to  drop under value 'minRiskPerc'.
'DropRiskPerc': default 1
'riskMNGMTtradeNUMBER': default 10
'minRiskPerc': default 2
'riskMNGMTtradeGainMin': default 20

-->so for example, the first 10 trades have a fixed trade size of 50GBP per trade (5% of capital). From the 11th trade to the 20th trade i then wish it to be 4%, as risk percentage of 5% - dropriskperc equals 4%. and so on and so forth. Also important for me that during the trades the risk percentage is calculated only every 'riskMNGMTtradeNUMBER' trades, so it will always be 50GBP in this example for the first 10 trades and it will not fluctuate when the capital grows/shrinks. The 50GBP will change then when the risk percentage is recalculated before the 11th trade(so it is calculated after the 10th trades finished but not before that, if the 11th trades opens before that it will hav e to use the old trade size of 50GBP). 

The trade system:

the signal requires three candles. for a long entry:
candle A with a low, the next candleB needs to have a lower Low than the previous candle (tolerance variable needed) and that lower low is on or under the lower bollinger line. candle C then needs to have a higher low and a higher  high than candleB. entry is on the closing price of candle C(on a 4hr timeframe in the last 2minutes of the candle C, so i dont loose money when there is a gap to the next candle) so i want the Expert advisor to enter the trade shortly before candle C is finished.

for a short it is the same signals just highs not lows.

 

also do not enter the trade if the entry is over the bollinger middle line for a long, or under the bollinger middle line for a short. 



please add a tickbox that enables/disables trend against the trade, determinded my a simple or exponential moving average of default 200 (variable name 'trend_MA')

Stoploss: spread+ 'stoploss_var' is right unter the low of candle b

tickbox enables limit exit:
limit: limit is for a buy automaticly the upper bollinger line so the limit changes every candle by the previous candles upper bollinger line.
 limit is for a short automatically the lower bollinger line so the limit changes every candle by the previous candles lower bollinger line.

tickbox enables SINGLE 2bar stoploss that overriges the standard stoploss after the first candle:

for a buy: the stoploss is tolerance_stoploss away from a 2 candle high.

tickbox enables DUAL 2 bar stoploss:

needs the previous tickbox enabled too, then exits with that with 50% and the other 50% exit the 2nd time there is a 2bar candle high. i'm attaching a picture demonstrating signal, stoploss and limits.

thanks in advance,
Sylvia


Responded

1
Developer 1
Rating
(59)
Projects
182
55%
Arbitration
31
45% / 16%
Overdue
103
57%
Free
2
Developer 2
Rating
(72)
Projects
147
67%
Arbitration
21
10% / 71%
Overdue
44
30%
Free
3
Developer 3
Rating
(187)
Projects
367
56%
Arbitration
45
22% / 56%
Overdue
188
51%
Free
Published: 1 article, 6 codes
4
Developer 4
Rating
(339)
Projects
809
73%
Arbitration
30
33% / 37%
Overdue
194
24%
Free
5
Developer 5
Rating
(1235)
Projects
2820
80%
Arbitration
156
22% / 43%
Overdue
487
17%
Free
6
Developer 6
Rating
(34)
Projects
80
34%
Arbitration
13
31% / 54%
Overdue
19
24%
Free
7
Developer 7
Rating
Projects
0
0%
Arbitration
0
Overdue
0
Free
8
Developer 8
Rating
(73)
Projects
257
53%
Arbitration
16
50% / 38%
Overdue
83
32%
Free
9
Developer 9
Rating
(30)
Projects
93
49%
Arbitration
18
56% / 17%
Overdue
38
41%
Free
10
Developer 10
Rating
(4)
Projects
7
43%
Arbitration
5
0% / 60%
Overdue
3
43%
Free
Published: 1 code
Similar orders
I am looking for someone to build me a modular auto trader in Sierra chart and an Innie builder so that I can replicate my current Algas that I already have built. I've sent examples below can you please let me know how much you would charge me. I'm pretty good at building the signals myself but I do not know how to build the ocos order entry and I'm trying to get quotes and go with the person who seems they can help
i need price action and candle logic understand programmer need for this job... first understand logic and interested please message .... first understand logic and interested please message .... 2 types of hedge entry conditions: 1 is candle based 1- when i start point ea hh candle buy entry, after ll made 2- below the previous candle hedge sell order 3- if market goes again hh, if sell order profit book again
Ea which is based on the price returning to the open or close of a 1-minute candle or zone of candles. panel on chart need too have buttons : trainding on/off close all close profit add buy stop add buy limit add sell stop add sell limit ( all to existing setups) calculating profit/loss for a single open setup and in total in account currency calculating profit/loss for a single open setup and in total in percentage
Hi, I’m looking for an experienced MQL5/MT4 developer to work on a trading BOT project. I currently have an MT4 demo environment with IC Markets for testing, but the complete strategy specifications have not yet been provided. I’d like you to first review the available project/BOT information and let me know what you would need to configure, develop, and properly forward-test it. The testing should cover entries
PEACE BOT 30+ USD
#property version "2.10" #property description "Chizzy Trend Rider - HFM-ready (hedging/netting safe)" #include <Trade/Trade.mqh> CTrade trade; //================ INPUTS =================// input double LotSize = 0.01; // Fixed lot (used if RiskPercent = 0) input double RiskPercent = 0.0; // Risk % of balance per trade (0 = use LotSize) input ulong MagicNumber = 220026; input ENUM_TIMEFRAMES TrendTF =
PRECISION ENTRY PRO EA V1 MT5 EXPERT ADVISOR REQUIREMENTS SPECIFICATION PROJECT NAME: Precision Entry Pro EA V1 PLATFORM: MetaTrader 5 (MT5) LANGUAGE: MQL5 1. PROJECT OBJECTIVE I want a simple, reliable and fully automated MT5 Expert Advisor based on the following trading concept: TREND → MARKET STRUCTURE → FIBONACCI RETRACEMENT → PRICE ACTION CONFIRMATION → ENTRY → STOP LOSS → TAKE PROFIT. The purpose of V1 is to
I need an MT5 Expert Advisor (EA) specifically for NFP news trading. Strategy: - Trade EURUSD during the US Non-Farm Payroll (NFP) release. - Automatically identify the NFP release time. - Place a Buy Stop above the current price and a Sell Stop below the current price shortly before NFP. - Adjustable distance from current price for both pending orders. - When one order is triggered, automatically cancel the opposite
yoo i want to make a trading bot i have my strategy in videos and also the rules to if anyone can work it out for me i will be glad welcome your bid and it urget let connect here on mgl5 And if you know you can not do the project without getting paid first please don't bid thanks
Bonjour ! Je vous ai contacté pour le développement de mon EA sur MetaTrader. Je souhaite intégrer une stratégie précise avec une gestion stricte des règles du courtier Exness. J'ai déjà préparé le cahier des charges complet sous format PDF avec toutes les spécifications techniques
SKBOT 35+ USD
want an MQL5 Expert Advisor (EA) for MetaTrader 5, mainly for XAUUSD (Gold). Strategy: The EA should trade based on market structure, Break of Structure (BOS), Fair Value Gaps (FVG), Order Blocks (OB), and Fibonacci retracement levels. BUY setup: Detect bullish market structure. Detect a bullish Break of Structure (BOS). Identify the relevant bullish FVG and/or Order Block created around the structure move. Use

Project information

Budget
Deadline
from 1 to 20 day(s)