Hi everyone, i was optimazing some EA's and got a question... can be the optimized parameters tested in the same process?? Example: Optimizing from 2009 to 2018 and Test those optimized parameters for the 2019, can be done all in only one process? like optimization and backtest running at the same time?
Thanks for any reply, wish many pips for everyone.
Allow the use of cookies to log in to the MQL5.com website.
Please enable the necessary setting in your browser, otherwise you will not be able to log in.
You are signed in. Two-factor authentication has been disabled. Set it up again and scan a new QR code, or continue with two-factor authentication disabled.
Hi everyone, i was optimazing some EA's and got a question... can be the optimized parameters tested in the same process?? Example: Optimizing from 2009 to 2018 and Test those optimized parameters for the 2019, can be done all in only one process? like optimization and backtest running at the same time?
Thanks for any reply, wish many pips for everyone.