Spécifications

I would like to develop my own strategy. Is based on Ichimoku, Bolinger Bands and Moving Averages.   

The developer needs to apply a stopping time when the transaction its closed and opened.

The expert needs to read the image that Ichimoku and Bolinger Bands are creating on the chart


Répondu

1
Développeur 1
Évaluation
(71)
Projets
115
52%
Arbitrage
4
25% / 75%
En retard
15
13%
Travail
2
Développeur 2
Évaluation
(356)
Projets
632
26%
Arbitrage
89
73% / 13%
En retard
12
2%
Gratuit
3
Développeur 3
Évaluation
(186)
Projets
205
26%
Arbitrage
12
25% / 58%
En retard
39
19%
Gratuit
4
Développeur 4
Évaluation
(555)
Projets
922
48%
Arbitrage
300
59% / 25%
En retard
123
13%
Chargé
5
Développeur 5
Évaluation
(711)
Projets
1030
39%
Arbitrage
47
49% / 23%
En retard
84
8%
Gratuit
6
Développeur 6
Évaluation
(11)
Projets
17
59%
Arbitrage
2
0% / 100%
En retard
2
12%
Gratuit
7
Développeur 7
Évaluation
(80)
Projets
112
7%
Arbitrage
8
25% / 38%
En retard
26
23%
Gratuit
8
Développeur 8
Évaluation
(38)
Projets
50
10%
Arbitrage
1
0% / 0%
En retard
8
16%
Gratuit
9
Développeur 9
Évaluation
(466)
Projets
494
52%
Arbitrage
10
60% / 20%
En retard
3
1%
Gratuit
10
Développeur 10
Évaluation
(5)
Projets
11
18%
Arbitrage
0
En retard
3
27%
Gratuit
11
Développeur 11
Évaluation
(2050)
Projets
2601
62%
Arbitrage
113
44% / 26%
En retard
417
16%
Travail
12
Développeur 12
Évaluation
(250)
Projets
400
38%
Arbitrage
82
41% / 20%
En retard
69
17%
Chargé
13
Développeur 13
Évaluation
(40)
Projets
86
13%
Arbitrage
29
31% / 48%
En retard
35
41%
Chargé
Commandes similaires
VMP Painel 45+ USD
Construction of trading panel Trading panel with vertical and horizontal stop take profit lines and multiplication grid 1 horizontal and vertical purchase and sales lines and placement of orders in a grid with order number multiplier 2 that all lines must be visible with stop and take profits pre orders, all lines must be visible on the chart I'll post a picture to give you an idea of what it could be
Panel cointegration 40 - 60 USD
I need a panel, where I include several assets, on average 20, and do the cointegration test in 10 periods with a list of other assets pre-selected in the panel settings. Only the cointegration test will be carried out in 10 periods, in the selected time frame

Informations sur le projet

Budget
50 - 200 USD
Pour le développeur
45 - 180 USD
Délais
de 1 à 10 jour(s)