Tâche terminée
Temps d'exécution 1 jour
Commentaires du client
to the point and amazing
Spécifications
R3 = PP + ((High - Low) x 1.000)
R2 = PP + ((High - Low) x 0.618)
R1 = PP + ((High - Low) x 0.382)
PP = (H + L + C) / 3
S1 = PP - ((High - Low) x 0.382)
S2 = PP - ((High - Low) x 0.618)
S3 = PP - ((High - Low) x 1.000)
Variables : OPEN CLOSE
HIGH LOW
M1 : Pivot mid level between S1 and S2
M2 : Pivot mid level between S1 and PP
M3 : Pivot mid level between PP and R1
M4 : Pivot mid level between R1 and R2
So when I enter the variables mentioned above I need the values to be given to me in the M1 , M2 , M3 , M4
Editable Simple excel sheet Will do
Répondu
1
Évaluation
Projets
129
18%
Arbitrage
11
27%
/
55%
En retard
4
3%
Gratuit
2
Évaluation
Projets
369
33%
Arbitrage
34
41%
/
29%
En retard
108
29%
Gratuit
Publié : 1 code
3
Évaluation
Projets
5
60%
Arbitrage
1
0%
/
0%
En retard
2
40%
Gratuit
4
Évaluation
Projets
462
26%
Arbitrage
139
20%
/
60%
En retard
100
22%
Gratuit
5
Évaluation
Projets
195
42%
Arbitrage
13
8%
/
54%
En retard
9
5%
Gratuit
Publié : 3 codes
6
Évaluation
Projets
369
66%
Arbitrage
10
50%
/
0%
En retard
46
12%
Gratuit
7
Évaluation
Projets
1070
50%
Arbitrage
39
28%
/
41%
En retard
49
5%
Gratuit
Publié : 1 article, 8 codes
8
Évaluation
Projets
196
43%
Arbitrage
17
29%
/
59%
En retard
27
14%
Gratuit
9
Évaluation
Projets
19
11%
Arbitrage
3
0%
/
100%
En retard
2
11%
Gratuit
Informations sur le projet
Budget
30+ USD
Délais
à 1 jour(s)