I NEED A DASHBOARD THAT DISPLAYS DROP BASE DROP (DBD) AND RALLY BASE RALLY (RBR) SETUPS ON ALL OPEN INSTRUMENTS ON MY PLATFORM (MT4|MT5).

2019.08.14 Indicators

Specification


IT SHOULD ALSO INCLUDE  ALERT FUNCTIONALITIES (alertMessage, alertEmail, alertSound, Notification )THAT  CAN BE ENABLED AND DISABLED.



CONDITIONS :

RBR: Candle 1 and 3 must have a bigger body than candle 2 

        Candle 2 must open at the close or high of candle 1 and close within the body of candle 1.

        Candle 3 must open at the close of candle 2 and close above candle 1 and 2

        Candle sizes must have a modifiable functionality

        Both candle 1 and 3 must have short wicks

        There must be arrows to indicate the potential setup 

        There must be a functionality to hide/Unhide arrows

        Setup must be displayed ONLY after the close of candle 3

        Please view the attached images


DBD: Candle 1 and 3 must have a bigger body than candle 2 

        Candle 2 must open  within the body of candle 1 and close lower than candle 1

        Candle 3 must open at the close of candle 2 and close below candle 1 and 2

        Candle sizes must have a modifiable functionality

        Both candle 1 and 3 must have short wicks

        There must be arrows to indicate the potential setup

         There must be a functionality to hide/Unhide arrows

         Setup must be displayed ONLY after the close of candle 3

         Please view the attached images 

Responded

1
Developer 1
2019.08.14
Rating
4.92
(87)
Projects
185
32%
Arbitration
45
9% / 67%
Overdue
74
40%
Busy
2
Developer 2
2019.08.14
Rating
4.9
(660)
Projects
1038
65%
Arbitration
99
30% / 40%
Overdue
234
23%
Loaded
3
Developer 3
2019.08.14
Rating
4.71
(173)
Projects
363
30%
Arbitration
140
19% / 51%
Overdue
132
36%
Busy
4
Developer 4
2019.08.14
Rating
4.96
(325)
Projects
365
35%
Arbitration
30
23% / 57%
Overdue
72
20%
Busy
5
Developer 5
2019.08.14
Rating
4.76
(67)
Projects
100
18%
Arbitration
46
4% / 59%
Overdue
42
42%
Busy
6
Developer 6
2019.08.14
Rating
4.89
(80)
Projects
113
41%
Arbitration
5
40% / 40%
Overdue
3
3%
Loaded

Project information

Budget
80+ USD
Deadlines
from 1 to 7 day(s)

Customer

Placed orders4
Arbitrage count0